Cruise Europe, in conjunction with Cruise Baltic and Cruise Britain, has launched its active onshore power (OPS) database, detailing those ports in the Cruise Europe geographical area which are either onshore power ready, or will be within five years. The database lists 23 ports, alongside which are details such as how the OPS is supplied, connection times, applicable fees, discounts and incentives. It will be constantly updated so that cruiselines have key information on both existing and the current development of OPS facilities. This will be a relevant tool in planning potential itineraries. By 2030, under the EU Fit for 55 package, all ports in the EU and visiting ships need to use OPS or an alternative means to power a ship whilst at berth instead of using their diesel generators. Availability of electricity from clean energy or low carbon sources ensures an overall reduction of greenhouse gas emissions.”
OPS (Onshore Power System) | Yes |
Shore power within the next 5 years | In the future |
OPS (Onshore Power System) | No |
Shore power within the next 5 years |
OPS (Onshore Power System) | In the future |
Shore power within the next 5 years | Yes |
OPS (Onshore Power System) | |
Shore power within the next 5 years |
OPS (Onshore Power System) | |
Shore power within the next 5 years |
OPS (Onshore Power System) | No |
Shore power within the next 5 years | Yes |
OPS (Onshore Power System) | No |
Shore power within the next 5 years |
OPS (Onshore Power System) | |
Shore power within the next 5 years |
OPS (Onshore Power System) | In the future |
Shore power within the next 5 years | In the future |
OPS (Onshore Power System) | In the future |
Shore power within the next 5 years | On request |
OPS (Onshore Power System) | |
Shore power within the next 5 years |
OPS (Onshore Power System) | No |
Shore power within the next 5 years |
OPS (Onshore Power System) | In the future |
Shore power within the next 5 years | Yes |
OPS (Onshore Power System) | No |
Shore power within the next 5 years |
OPS (Onshore Power System) | In the future |
Shore power within the next 5 years | Yes |
OPS (Onshore Power System) | In the future |
Shore power within the next 5 years | In the future |
OPS (Onshore Power System) | No |
Shore power within the next 5 years | Yes |
OPS (Onshore Power System) | No |
Shore power within the next 5 years | Yes |
OPS (Onshore Power System) | No |
Shore power within the next 5 years | No |
OPS (Onshore Power System) | |
Shore power within the next 5 years |
OPS (Onshore Power System) | |
Shore power within the next 5 years |
OPS (Onshore Power System) | |
Shore power within the next 5 years |
OPS (Onshore Power System) | Yes |
Shore power within the next 5 years |