Reykjavik


Port information



Reykjavik
(c) Reykjavik

Reykjavik




Port attractions






Port views



Faxaflóahafnir sf.
Faxaflóahafnir sf.
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir
Faxaflóahafnir




Port facts



Nautical information

Max. Length For Berth, M:
-
Max. Draught, M:
-
More Info Draught:
-
Max. Air Draught, M:
-
More Info Air Draught:
No. Of Quays:
Quay Length Total, M:
-
Quay Depth, M:
-
Anchorage Available:
Anchorage Compulsory:
Passenger Terminal:
Pilotage Compulsary:
Tugs Available:
Bunkering:
Tidal Movement/range, M:
-
Water:
Ships Tenders Allowed:
Garbage Disposal:
Airport Distance, Km:
-
City Centre Distance, Km:
-

Sustainability

Are ships allowed burn HFO using:
On-shore power supply to cruise vessels:
No
LNG bunkering supply to cruise vessels:
✔ By vessel / barge
Supplying alternative fuels:
Reception Facilities for Contaminated Ballast Water:
Reception Facilities for Waste Oils:
Passengers
Calls
Passengers by Source in 2023
Calls 2023


Onshore Power

Onshore Power
OPS (Onshore Power System)
Yes
Shore power within the next 5 years
Yes
Requirements
Defined Compatibility Assessment process for each berth and ship combination to IEC/IEEE 80005-1
Yes
Defined Compatibility Assessment process for each berth and ship combination to IEC/IEEE 80005-1 - Comments
Faxaflóahafnir (FFH) has implemented a requirement that all ships must be connected to shore if a shore connection is available. As such, we would like to request that your ships dock at the pier in Faxagarður or Miðbakki Reykjavík and connect to the Low Voltage Shore Connection (LVSC) available there.
Information/documentation from the ship for the port before the first connection
Yes
Information/documentation from the ship for the port before the first connection - Comments
For ordering of shore connection please refer to Faxaflóahafnir webpage: www.faxafloahafnir.is/en/
Additional requirements for first-time connectio/max. duration between connections before process reapplies
Connection Time
Connection time from all fast to full operational SSE (Shore Side Electricity)
Disconnection time
Uninterrupted power supply guaranteed by shore power provider whilst connected
Restrictions / Penalties / Insurance
Weather conditions/restrictions/other limitations for safe use of SSE
Penalties in case of failure to connect by the ship: weather/itinerary changes/technical issues
Insurance covering any potential damage caused by the SSE
Port Fees
Utility standard/usage fees in addition to kWh rate
Tax/duty fees applicable
Other fees related to shore power
Useful Information
Discounts/incentives linked to shore power usage
Berthing policy linked to shore power usage
Confirmation time of the vessel for planned shore power usage before ETA

Port contacts


Contact


Sigurdur Olafsson, Marketing Manager
Tryggvagata 17
101 Reykjavík
Iceland
+354 788 7185






 
Page last updated: 2024-03-25 11:15


@