Hundested


Port information



Hundested
(c)

Hundested

Coming soon



Port attractions






Port views



Port of Hundested
Port of Hundested
Port of Hundested
VisitNordsjaelland
Port of Hundested




Port facts



Nautical information

Max. Length For Berth, M:
250
Max. Draught, M:
7,9
More Info Draught:
-
Max. Air Draught, M:
Unlimit
More Info Air Draught:
No. Of Quays:
1
Quay Length Total, M:
300
Quay Depth, M:
8,2
Anchorage Available:
no
Anchorage Compulsory:
no
Passenger Terminal:
no
Pilotage Compulsary:
no
Tugs Available:
yes
Bunkering:
yes
Tidal Movement/range, M:
0,5
Water:
yes
Ships Tenders Allowed:
yes
Garbage Disposal:
yes
Airport Distance, Km:
75
City Centre Distance, Km:
1

Sustainability

Are ships allowed burn HFO using:
On-shore power supply to cruise vessels:
LNG bunkering supply to cruise vessels:
Supplying alternative fuels:
Reception Facilities for Contaminated Ballast Water:
Reception Facilities for Waste Oils:
Passengers
Calls
Passengers by Source in 2023
Calls 2023


Onshore Power

Onshore Power
OPS (Onshore Power System)
Shore power within the next 5 years
Requirements
Defined Compatibility Assessment process for each berth and ship combination to IEC/IEEE 80005-1
Information/documentation from the ship for the port before the first connection
Additional requirements for first-time connectio/max. duration between connections before process reapplies
Connection Time
Connection time from all fast to full operational SSE (Shore Side Electricity)
Disconnection time
Uninterrupted power supply guaranteed by shore power provider whilst connected
Restrictions / Penalties / Insurance
Weather conditions/restrictions/other limitations for safe use of SSE
Penalties in case of failure to connect by the ship: weather/itinerary changes/technical issues
Insurance covering any potential damage caused by the SSE
Port Fees
Utility standard/usage fees in addition to kWh rate
Tax/duty fees applicable
Other fees related to shore power
Useful Information
Discounts/incentives linked to shore power usage
Berthing policy linked to shore power usage
Confirmation time of the vessel for planned shore power usage before ETA

Port contacts


Contact


Søren Brink Andersen, Harbour Master
Nordre Beddingsvej 24
3390 HUNDESTED
Denmark
+45 4793 7234






 
Page last updated: 2018-12-21 16:33


@

Subscribe to our newsletter